A colocation operator required a full MEP design for a 4 MW data center that could support mixed rack density loads, meet global redundancy, fault tolerance and expected uptime standards as well as ASHRAE standards, delivering a scalable, high-availability electrical and cooling architecture from the ground up.

Colocation Data Center Operator, India
Aug 23, 2026•
Next Reading


