Right Decisions Before Capital Is Committed
Most data center investment decisions are made before the hard questions have been asked. Site risks are unquantified, regulatory hurdles are unknown, and financial models are built on assumptions rather than evidence. Our data center planning services change that.
Four Services Across The Full Pre - Design Lifecycle
Each service targets a specific stage of the decision making journey. They can be engaged individually or as a sequenced programme.
Know if your project is viable before committing capital
Structured analysis of technical viability, financial performance, and statutory compliance producing a DPR usable for AHJ submissions, lender presentations, and investment committee approvals.
- -DPR with CapEx/OpEx/RoI
- -Tier mapping (TIA 942C)
- -Power & utilities roadmap
- -AHJ package
- -Risk register
Remove Subjectivity From Site Selection
Structured assessment and ranking of shortlisted land parcels across power, fibre, latency, environmental risk, regulatory fit, and commercial levers. Unit-priced per site.
- -Location SWOT per site
- -Benchmarking scorecard
- -Policy & incentive mapping
- -Negotiation points
A rigorous Go / No-Go gate before construction begins
Two phases: Initial Analysis for rapid risk screening (4–6 weeks) and Detailed Analysis for investment grade due diligence covering geotechnical, environmental, and regulatory domains.
- -TVRA & TRAM analysis
- -Geotechnical surveys
- -EIA Phase 1 & 2
- -Sun path analysis
- -Regulatory compliance
Optimise and future-proof your existing facility
Advisory for operators of legacy or sub-optimal assets. PUE improvement, connectivity redesign, or compliance posture: structured assessment and prioritised technology roadmap.
- -PUE enhancement roadmap
- -Connectivity & DC interconnect
- -Compliance posture plan
- -Asset upgrade matrix
What Makes Our Planning Outputs Different
Generic feasibility reports require further validation. Ours do not. Every deliverable is bankable, AHJ-ready, and certification aligned from day one.
Planning Engagements We Run And For Whom
Different clients come to planning with different objectives.
A Structured Six - Phase Engagement
Every planning engagement follows a structured process with clear decision points. Clients are never committed to full scope before understanding preliminary findings.
Mobilisation
NDA, SOW, site access, data room established.
Interim Review
Preliminary findings shared for client sense-check.
Ongoing Support
AHJ submissions, investor queries, regulatory follow-up.
Scoping
Project type, use case, site shortlist, and desired outcomes defined.
Field & Desk Work
Surveys, sampling, utility data, financial modelling, analysis.
Delivery
Final reports, stakeholder debrief, Q&A and recommendations.
Scoping
Project type, use case, site shortlist, and desired outcomes defined.
Mobilisation
NDA, SOW, site access, data room established.
Field & Desk Work
Surveys, sampling, utility data, financial modelling, analysis.
Interim Review
Preliminary findings shared for client sense-check.
Delivery
Final reports, stakeholder debrief, Q&A and recommendations.
Ongoing Support
AHJ submissions, investor queries, regulatory follow-up.
Latest from Technavious
Hyperscale Data Centre Operator, India
Live-facility power-density upgrade from 6 kVA to 15 kVA.
BlogData Centre Feasibility Report India: Critical Site Selection Parameters Before Design Begins
Critical site-selection inputs before data center design begins.
PerspectiveData Centre Feasibility in India
What a bankable feasibility study must evaluate before investment.
BlogBrownfield Data Centre Upgrade: What Most Teams Get Wrong
Common brownfield upgrade mistakes and how to avoid them.
A standard DC Project Feasibility engagement takes six to eight weeks from scoping to final DPR delivery. Timelines extend when projects involve multiple sites or specialist sub-studies such as geotechnical surveys.
Yes. The DPR is structured to meet the documentation requirements of leading infrastructure lenders and institutional investors, including the financial model, risk register, and AHJ compliance package.
A full technical site DD includes physical field surveys, laboratory sample testing, drone surveys, geotechnical investigations, and digital data analysis — far beyond what existing data sources alone can reveal.
Yes. Technavious has delivered planning engagements across Asia-Pacific, the Middle East, the UK, and the United States, deploying our partner network alongside our in-house team for local regulatory knowledge.
A planning engagement creates documented project intelligence that flows directly into design and certification.
DC Design & Engineering
Clients with approved feasibility move directly into the Decision Accelerator Pack or Detailed Design & Execution Pack.
TIA 942C Design Certification
Clients who receive TIA/ISO compliance checklists in the feasibility report frequently engage for formal design certification immediately.
Brownfield Retrofit Design
Upgradation Consulting clients with confirmed upgrade roadmaps move directly into Detailed Design (Brownfield Retrofit).

Ready To Scope Your Data Center Planning Engagement?
Share your data center planning requirements, and our experts will help you define a clear scope aligned with your project priorities.