Right Decisions Before Capital Is Committed

Most data center investment decisions are made before the hard questions have been asked. Site risks are unquantified, regulatory hurdles are unknown, and financial models are built on assumptions rather than evidence. Our data center planning services change that.

0+Planning Engagements
0 - 6 WeeksSaved Pre-Construction
0%AHJ - Ready Deliverables
Pan - GlobalCoverage
WHAT IS INCLUDED

Four Services Across The Full Pre - Design Lifecycle

Each service targets a specific stage of the decision making journey. They can be engaged individually or as a sequenced programme.

01 FEASIBILITY

Know if your project is viable before committing capital

Structured analysis of technical viability, financial performance, and statutory compliance producing a DPR usable for AHJ submissions, lender presentations, and investment committee approvals.

  • -DPR with CapEx/OpEx/RoI
  • -Tier mapping (TIA 942C)
  • -Power & utilities roadmap
  • -AHJ package
  • -Risk register
02 SITE BENCHMARKING

Remove Subjectivity From Site Selection

Structured assessment and ranking of shortlisted land parcels across power, fibre, latency, environmental risk, regulatory fit, and commercial levers. Unit-priced per site.

  • -Location SWOT per site
  • -Benchmarking scorecard
  • -Policy & incentive mapping
  • -Negotiation points
03 SITE DUE DILIGENCE

A rigorous Go / No-Go gate before construction begins

Two phases: Initial Analysis for rapid risk screening (4–6 weeks) and Detailed Analysis for investment grade due diligence covering geotechnical, environmental, and regulatory domains.

  • -TVRA & TRAM analysis
  • -Geotechnical surveys
  • -EIA Phase 1 & 2
  • -Sun path analysis
  • -Regulatory compliance
04 UPGRADATION

Optimise and future-proof your existing facility

Advisory for operators of legacy or sub-optimal assets. PUE improvement, connectivity redesign, or compliance posture: structured assessment and prioritised technology roadmap.

  • -PUE enhancement roadmap
  • -Connectivity & DC interconnect
  • -Compliance posture plan
  • -Asset upgrade matrix
WHY TECHNAVIOUS

What Makes Our Planning Outputs Different

Generic feasibility reports require further validation. Ours do not. Every deliverable is bankable, AHJ-ready, and certification aligned from day one.

WHO WE SERVE

Planning Engagements We Run And For Whom

Different clients come to planning with different objectives.

Swipe to view table
Segment
Challenge
Technavious Response
MTDC Developers
Need bankable DPRs and site DD for investor submissions before sanctioning capital expenditure.
Integrated feasibility with AHJ package and financial model accepted by leading infrastructure lenders.
Hyperscalers
Require multi-site benchmarking, sun path analysis, and EHS assessments for 100MW+ campuses.
Pan-global coverage, sun path analysis as standard, all use case specialisation and neutral vendor positioning.
PE / Infra Funds
Need independent technical and financial DD before committing investment capital to DC assets.
Engineering-backed financial models with risk registers quantifying cost and timeline impact.
Enterprise IT / Captive DC
Limited internal DC expertise and uncertainty over whether a new facility or upgrade is the right investment.
End-to-end advisory from a single partner with a compliance aligned roadmap and RoI-driven recommendations.
HOW WE WORK

A Structured Six - Phase Engagement

Every planning engagement follows a structured process with clear decision points. Clients are never committed to full scope before understanding preliminary findings.

1
PHASE 1

Scoping

Project type, use case, site shortlist, and desired outcomes defined.

2
PHASE 2

Mobilisation

NDA, SOW, site access, data room established.

3
PHASE 3

Field & Desk Work

Surveys, sampling, utility data, financial modelling, analysis.

4
PHASE 4

Interim Review

Preliminary findings shared for client sense-check.

5
PHASE 5

Delivery

Final reports, stakeholder debrief, Q&A and recommendations.

6
PHASE 6

Ongoing Support

AHJ submissions, investor queries, regulatory follow-up.

FREQUENTLY ASKED QUESTIONS

A standard DC Project Feasibility engagement takes six to eight weeks from scoping to final DPR delivery. Timelines extend when projects involve multiple sites or specialist sub-studies such as geotechnical surveys.

Yes. The DPR is structured to meet the documentation requirements of leading infrastructure lenders and institutional investors, including the financial model, risk register, and AHJ compliance package.

A full technical site DD includes physical field surveys, laboratory sample testing, drone surveys, geotechnical investigations, and digital data analysis — far beyond what existing data sources alone can reveal.

Yes. Technavious has delivered planning engagements across Asia-Pacific, the Middle East, the UK, and the United States, deploying our partner network alongside our in-house team for local regulatory knowledge.

NATURAL NEXT STEPS

A planning engagement creates documented project intelligence that flows directly into design and certification.

PLANNING COMPLETE

DC Design & Engineering

Clients with approved feasibility move directly into the Decision Accelerator Pack or Detailed Design & Execution Pack.

COMPLIANCE CHECKLIST ISSUED

TIA 942C Design Certification

Clients who receive TIA/ISO compliance checklists in the feasibility report frequently engage for formal design certification immediately.

BROWNFIELD ADVISORY COMPLETE

Brownfield Retrofit Design

Upgradation Consulting clients with confirmed upgrade roadmaps move directly into Detailed Design (Brownfield Retrofit).

Data Center Grid Background