Engineering-Led Data Center Build Services

The most common failure mode in data center construction happens at the interface between the design team and the build team when a contractor makes a practical decision on site that quietly overwrites an engineering decision made at the drawing stage. Technavious eliminates that failure mode.

KEY STATS
Design continuitySame engineers govern build
0% vendor-neutralNo preferred panel
Greenfield & brownfieldBoth methodologies
Owner's EngineerIndependent PMC model
WHAT WE DELIVER

Two Complementary Services Covering The Full Physical Execution Lifecycle

Build PM and Supply & Installation are most effective when engaged as a combined package — but can be used independently.

01 EPC PROJECT MANAGEMENT

Engineering-led build governance — same team, start to finish

Comprehensive EPC PM covering scope, schedule, cost, quality, OHSE, vendor management, and HOTO. The same engineers who produced the design govern its execution on site. RFIs resolved directly.

  • -Master programme management
  • -ITP governance & quality control
  • -On-site OHSE compliance
  • -Structured HOTO process
02 SUPPLY & INSTALLATION

Vendor-neutral procurement. Costs passed through transparently.

End-to-end procurement and physical installation of all non-IT infrastructure. Vendor-neutral. Equipment costs passed through at cost plus a stated management fee — no bundled margin, no preferred vendor incentive.

  • -Power: switchgear, UPS, PDUs, transformers
  • -Cooling: CRAC/CRAH, chillers, cooling towers
  • -ELV: CCTV, access control, BMS, DCIM
  • -Fire protection, cabling, civil ancillaries
WHY TECHNAVIOUS

What Makes Technavious Different On Build

Design-build continuity. Vendor neutrality. Brownfield capability. These are not claimed differentiators — they are structural features of how the service is delivered.

WHO WE SERVE

Build Engagements We Run And For Whom

From new campus construction to live-environment retrofit and independent PMC.

Swipe to view table
Segment
Challenge
Technavious Response
DC Developers (Greenfield EPC)
Design-build interface risk, contractor-driven design erosion, cost and schedule overruns from managing multiple teams
Single partner across Design and Build. Design intent preserved through EPC PM. Simulation-validated designs reduce RFIs and change orders.
Enterprise IT
Limited in-house DC project management, vendor selection complexity, and OHSE compliance requirements
Structured governance from day one. Vendor-neutral procurement. Single point of accountability for cost, time, and quality.
Co-location Operators (Retrofit)
Live environment constraints, phased delivery requirements, and equipment compatibility on existing facilities
Brownfield execution methodology with live environment protocols. Phased delivery minimise disruption. Constraints mapped at design stage.
Investors via PMC
Contractor performance visibility, cost and schedule variance, quality assurance without in-house engineering
Independent PMC with engineering depth. Shop drawing reviews, OHSE governance, HOTO validation. Owner's Engineer model.
HOW WE WORK

Six Phases From Mobilisation Through HOTO

No gap between design approval and build mobilisation. Same team in governance from handover of design through to final HOTO.

1
PHASE 1

Mobilisation

EPC PM team onboarded at design handover. Master programme and governance framework established.

2
PHASE 2

Procurement

Vendor selection: RFQ, technical evaluation, commercial negotiation. POs placed against approved budget.

3
PHASE 3

Installation

On-site installation management and supervision. ITP checkpoints at every milestone.

4
PHASE 4

Pre-commissioning

Installation completeness checks. Equipment integrity validation. Safety clearances before T&C.

5
PHASE 5

T&C Handover

Formal handover to T&C team (Design product line). Punch list managed through to T&C sign-off.

6
PHASE 6

HOTO

Final documentation package. Asset register, warranties, as-installed drawings. Formal handover-takeover completed.

FREQUENTLY ASKED QUESTIONS

Design erosion occurs when a contractor makes a practical substitution without engineering oversight. Technavious prevents this by keeping the same engineering team in active governance throughout construction. Our engineers are on site to resolve RFIs directly — every substitution requires explicit engineering approval before it proceeds.

No. Technavious operates on a vendor-neutral basis. Equipment recommendations are based solely on technical fit and commercial value. We do not operate a preferred vendor panel, and we do not earn a margin on supply — costs pass through at cost plus a clearly stated management fee.

Yes. Our brownfield execution methodology includes sequenced shutdown planning, temporary power and cooling provisions, and work packages scheduled to minimise disruption. Existing infrastructure constraints are mapped and managed at design stage — before construction commences.

The Owner's Engineer model applies when a client has already appointed an EPC contractor but needs independent technical governance. Technavious acts as the client's technical advocate — reviewing shop drawings, evaluating contractor performance, managing HOTO, and providing engineering depth to identify and resolve issues before they become cost overruns.

WHERE BUILD LEADS
BUILD COMPLETE

TIA-942 Audit & Certification

T&C sign-off and HOTO creates the documentation required for TIA 942C Facility Certification. The HOTO package feeds directly into the formal audit.

HOTO COMPLETE

ISO Multi-Standard Certification

Post-occupancy clients frequently need ISO 27001, 14001, and 9001 to satisfy enterprise tenant contracts. Achievable in a single three-month engagement.

LIVE FACILITY

Operational Resilience Assessment

Post-occupancy clients are strong candidates for operational resilience assessments as the facility matures and requirements evolve.

Data Center Grid Background

Ready To Discuss Your Data Center Build Project?

Share your project status, facility capacity and delivery priorities, and our experts will help you determine a suitable engagement model and scope.