Simulation - Validated Data Center Design Engineering
The most common and expensive failure in data center construction is discovering on site what should have been resolved on paper. Technavious eliminates that failure mode through a design process validated by simulation before construction begins, aligned to TIA 942C from day one.
Five Design Services Structured Around Your Stage Of Project Maturity
From early conceptual validation through to full construction documentation and independent peer review.
What Makes Our Design Outputs Different
Every design is validated by simulation before construction begins. Standards-aligned from day one. No sub-consultant dependency.
Design Engagements We Run And For Whom
From blank-page greenfield projects to independent peer review of existing designs.
A Structured Six - Phase Design Engagement
Design gate reviews at each phase — the client approves each level of detail before the next is developed.
Scope Alignment
Design product proposed with deliverable schedule and pricing. Client approves before design work commences.
Detailed Design
LOD 200 through LOD 450. Intermediate client reviews at each LOD gate. Simulation models submitted.
T&C & Handover
T&C programme executed against design specifications. Operational readiness sign-off and HOTO.
Design Brief
Client provides planning outputs, design requirements, and constraints. Technavious confirms scope.
Conceptual Design
Decision Accelerator Pack delivered in 30–45 days. Client reviews and approves before Detailed Design.
Construction Support
Vendor document review, design change management, RFI resolution on site by engineering team.
Design Brief
Client provides planning outputs, design requirements, and constraints. Technavious confirms scope.
Scope Alignment
Design product proposed with deliverable schedule and pricing. Client approves before design work commences.
Conceptual Design
Decision Accelerator Pack delivered in 30–45 days. Client reviews and approves before Detailed Design.
Detailed Design
LOD 200 through LOD 450. Intermediate client reviews at each LOD gate. Simulation models submitted.
Construction Support
Vendor document review, design change management, RFI resolution on site by engineering team.
T&C & Handover
T&C programme executed against design specifications. Operational readiness sign-off and HOTO.
Latest from Technavious
Hyperscale Data Centre Operator, India (Two Sites)
Independent two-site design review exposing power and cooling gaps.
Case StudyColocation Data Centre Operator, India
Simulation-led MEP design for a scalable 4 MW colocation facility.
BlogWhat Is Integrated Systems Testing (IST) in Data Centres and Why It Matters
Why integrated systems testing determines operational readiness.
BlogYour Data Center Doesn’t Need to Be Bigger — It Needs to Be Modular
Why modular design improves scalability, speed and investment efficiency.
CFD (Computational Fluid Dynamics) models airflow and thermal performance before construction begins. It validates cooling placement, identifies hot spots, and confirms the CRAC/CRAH configuration meets ASHRAE requirements — preventing design gaps discovered on site, which cost multiples of the design fee to correct.
The speed comes from our library of 100+ TIA 942C-certified reference designs. We start from a validated, certified precedent and adapt it to the specific use case — eliminating the validation step that makes bespoke conceptual design so time-consuming.
T&C validates that design intent was met — not merely that construction was completed. When the same team that designed the facility validates its realisation, accountability is clear and the TIA Facility Cert audit trail is unbroken. Contractors commissioning their own work creates a credibility and certification risk Technavious eliminates by design.
A digital twin is a simulation-ready virtual model delivered via cloud platform, allowing operators to model future capacity scenarios and test design changes before committing to physical works. Technavious delivers it as part of the Detailed Design pack — available from day one of operations.
Where Design Leads
A design engagement creates the documentation and compliance foundation that feeds directly into build governance and certification.
Decision Accelerator Pack
Clients with planning approval and no detailed design use the Decision Accelerator as the first step into the Design product line.
TIA 942C Facility Certification
T&C completion creates the HOTO documentation required to initiate TIA Facility Certification — a structured milestone, not an informal transition.
TIA 942C Design Certification
Clients whose designs have been peer-reviewed are strongly positioned for immediate Design Certification submission.

Ready To Scope A Decision AcceleratorFor Your Project?
Share your use case, capacity and target tier requirements, and our experts will help you define a design approach aligned with your project priorities.