A data center operator required full low-side MEP electrical implementation across two sites, a 600 kW facility in Lucknow (95 racks) and a 180 kW facility in Hyderabad with dual-source power cabling, earthing, CCTV trunking, and complete testing and handover to production standard.

Data Center Operator, India (Two Sites)
May 22, 2026•
Next Reading


