A data centre operator required full low-side MEPelectrical implementation across two sites , a 600 kWfacility in Lucknow (95 racks) and a 180 kW facility inHyderabad with dual-source power cabling, earthing,CCTV trunking, and complete testing and handover toproduction standard.

Data Centre Operator, India (Two Sites)
Sep 21, 2026•
Next Reading
